Home
Lake Rules
EAP
BLIA
BLDMD
Archives
Links
Dam Repair Photographs (09/25/2004)
Site of the old retaining wall
Site of the old gatehouse
Site of the old gatehouse
showing deterioration in the concrete
Site of the old dam retaining wall
Stones used to make the structure
President Claudia Careta poses
to show how large
the construction equipment really is.
The excavator
<< Return to Archives Home Page
Copyright 2009 - 2012
Last updated: February 15, 2010